How to present a quote builders can say yes to
Builders compare quotes line by line. Break yours down by floor level, itemise it, and attach the take-off sheets that show exactly what's in and what's out.
A builder’s estimator opens three quotes for the same package and has to work out which one is cheapest, and which one is cheapest because it left something out. A single lump sum makes that impossible, so it gets questioned, haggled or binned. A quote that’s broken down the way the building goes up gets checked quickly and trusted.
Here’s the layout that does that, step by step.
1. Break it down by floor level
Builders think in levels and stages. Split the quote the same way: ground floor, first floor, roof, and within each level the stages you price (frame, lock-up and cladding, fix, fit-off). Give each level its own subtotal.
It means the estimator can check one level against the plans in a few minutes, compare your first floor with someone else’s, and see straight away if a level is missing. It also makes progress claims easy later, because each level and stage is already its own number.
2. Itemise every line
Each line is one item with its quantity, unit, rate and total. “External wall frame 90×45, 62.4 lm at $48.50” can be checked against the plans. “Frame: $6,156” can’t. Put the allowances on their own lines too, like fixings and site clean, rather than hiding them in the rates.
- External wall frame 90×4562.4 lm × $48.50
- $3,026.40
- Internal wall frame 90×4548.0 lm × $41.00
- $1,968.00
- Bracing14 ea × $38.00
- $532.00
- Fixings allowance1 × $350.00
- $350.00
- Site clean1 × $280.00
- $280.00
- Floor joists96.0 m² × $32.00
- $3,072.00
- External wall frame 90×4558.8 lm × $52.00
- $3,057.60
- Internal wall frame 90×4541.2 lm × $44.00
- $1,812.80
- Bracing12 ea × $40.00
- $480.00
- Fixings allowance1 × $320.00
- $320.00
- Site clean1 × $260.00
- $260.00
- Ground floor frame
- $6,156.40
- First floor frame
- $9,002.40
- Total ex GST
- $15,158.80
- GST (10%)
- $1,515.88
A made-up example layout. Quantities and rates are for illustration only.
Notice the floor joists sit on the first floor, where they’re built, and the first-floor wall rates are higher than the ground floor’s, because working off a slab is quicker than working off a floor. A breakdown like this lets you show that instead of arguing it.
3. Attach the take-off sheets
Send the marked-up plans with the quote: each sheet coloured up with what you’ve measured, and a legend that shows each item’s colour and quantity. Keep each scope on its own set of sheets (frame on one, external lock-up and cladding on another) so they’re easy to read.
The sheets do two jobs. They prove the quantities, so nobody has to re-measure to trust you. And they show exactly what’s in: if a wall isn’t coloured, it isn’t in the price. That one picture heads off most variation arguments before they start.
4. Spell out inclusions, exclusions and assumptions
Three short lists, in plain words, under the summary:
- 1IncludedWhat you'll do and supply. For example: install wall frames, floor joists and bracing to the drawings listed; fixings and nails; site clean of our offcuts to the builder's bin.
- 2ExcludedWhat you won't. For example: supply of timber and trusses (by builder); scaffold and edge protection; crane hire; steel beams and posts; waste bins; anything not shown on the drawings listed; work outside normal hours.
- 3AssumptionsWhat the price depends on. The drawing numbers and revision you priced from, clear access, materials on site in time, and the work done in one continuous run.
5. Finish with the terms
- How long the price holds. 30 days is common; say what happens after that.
- The total ex GST, the GST and the total inc GST, so there's no question which one you meant.
- How you'll claim: progress claims by level and stage, and when they're due.
- How variations work: in writing before the work is done, at your rates.
If the price comes from properly built unit rates, all of this is quick to put together. The prebuild guide covers building those rates, and the markup versus margin guide makes sure the margin on top is the one you meant.
Sources
General information, not legal, tax or payroll advice. Check your award or EBA, and talk to your accountant about your own numbers.
A $45-an-hour carpenter costs about $86 for every hour on the tools once you add on-costs, leave, lost days and overheads. The maths, step by step.
Adding 20% to your costs gives a 16.7% margin, not 20%. How markup and margin differ, the divide-by table, and what it costs you over a year.
A prebuild is your price for one unit of work. Build it from your own job hours and real labour cost and every quote that uses it comes out right.
Run these numbers on every job, without the spreadsheet.
XGrafter prices every take-off from your own rates, keeps the margin in front of you, and syncs with Xero (MYOB is coming). See it on one of your own jobs.